Wednesday, September 9, 2015

[Reno Day 11]

1 Aug 2015 - A minor pictorial update on the renovation works. After completing the wall tiling, the next step to creating the Husband's games room would be to construct the glass panels sitting on the half-wall. We had to be mindful of the aesthetic and technical aspects here - air-con conduits have to run on the inside of the bedrooms instead of along the corridor to create the illusion of a wider, cleaner corridor. So a false beam has to constructed to secure the conduits within the room, at the same time creating the false impression of no conduits (no worries, it's not because we knocked down a structural beam. Everyone on the project knows we're suckers for working within the limits). 




Anyway, here's the rest of the wet works: toilet shower kerbs, kitchen cabinet kerb and washer kerb. All done within the first week of renovation! 